Paver sand calculator

ft
ft
in

Sand

Base layer material
in
Result
7.84 tons

A 20 ft by 10 ft area needs 0.62 cubic yards of sand for the bedding layer (0.86 tons) and 3.7 compacted cubic yards of crusher run for the base layer (6.98 tons): 7.84 tons in all. Loose material takes more room before it is compacted: order about 4.96–5.63 loose cubic yards of crusher run.

Bedding layer: sand
0.62 yd³ · 0.86 t
Base layer: crusher run
3.7 yd³ compacted · 6.98 t
Base layer: loose to order
4.96–5.63 yd³ (× 1.34–1.52, Wisconsin DOT research (WHRP))
Total cubic yards
4.32
Total cubic feet
116.7
Total tons
7.84
Total pounds
15,688
To order, rounded up to the half yard
1 + 6 yd³

How it is calculated

  1. Area = 20 ft × 10 ft = 200 sq ft.
  2. Bedding layer: 200 sq ft × 1 in ÷ 12 = 16.67 cu ft ÷ 27 = 0.617 yd³; × 2,795 lb/yd³ ÷ 2,000 = 0.86 tons.
  3. Base layer: 200 sq ft × 6 in ÷ 12 = 100 cu ft ÷ 27 = 3.704 yd³; × 3,770 lb/yd³ ÷ 2,000 = 6.98 tons.
  4. Base layer loose: 3.704 yd³ × 1.34–1.52 = 4.96–5.63 yd³; rounded up to 6 yd³.
SECTION1 inBedding layerSand6 inBase layerCrusher run7 insubgrade

Paver sand calculator by Calculate.diy.For planning only; confirm quantities with your supplier.